NYC Building Compliance Calendar

Every NYC building compliance deadline for 2026 in one place. DOB, FDNY, HPD, and DEP requirements organized by quarter.

DOBDepartment of Buildings
FDNYFire Department
HPDHousing Preservation & Development
DEPEnvironmental Protection
Q1

January — March 2026

Local Law 11 (FISP)

DOB

Cycle 9 Sub-Cycle A filing deadline for buildings with block numbers ending in 4, 5, 6, 7

Facade inspection reports due. Buildings classified Unsafe must have protective measures in place.

FDNY Sprinkler Systems

FDNY

Annual sprinkler system inspection and testing certification

Fire sprinkler systems must be inspected and tested annually. Certificates filed with FDNY.

Local Law 152

DOB

Gas piping inspection deadline for Community Boards in the current cycle year

GPS-2 certification must be filed. 60-day filing window after inspection completion.

Q2

April — June 2026

Local Law 87

DOB

Energy audit and retro-commissioning filings for buildings in the current cycle

Buildings over 50,000 sq ft with applicable block numbers must file energy audit and RCx reports.

FDNY Fire Alarm Systems

FDNY

Annual fire alarm system inspection and certification deadline

All commercial and residential buildings with fire alarm systems must complete annual inspections.

HPD Lead Paint

HPD

Annual lead paint survey requirement for buildings built before 1960

Buildings with children under 6 must conduct annual lead paint surveys and file with HPD.

Q3

July — September 2026

Local Law 26

DOB

Elevator CAT1 annual safety test deadline for elevators due in this period

Annual no-load safety tests (CAT1) must be completed and results filed with DOB.

Local Law 97

DOB

Annual carbon emissions reporting for buildings over 25,000 sq ft

Buildings must report carbon emissions. Penalties of $268/metric ton CO2 over the limit apply.

DEP Backflow Prevention

DEP

Annual backflow prevention device testing and certification

All backflow prevention devices must be tested annually by a licensed tester and results filed with DEP.

Q4

October — December 2026

FDNY Fire Suppression

FDNY

Commercial kitchen fire suppression system semi-annual inspection

Commercial cooking operations must have hood and duct fire suppression systems inspected.

Local Law 11 (FISP)

DOB

Cycle 9 Sub-Cycle B initial filing deadline approaching for block numbers ending in 8, 9, 0

Building owners in Sub-Cycle B should begin scheduling QEWI inspections for the upcoming deadline.

Boiler Inspections

DOB

Annual boiler inspection and operating permit renewal

All boilers must have a current operating permit. Annual inspections required before permit renewal.

How KomplyOS Helps

Stop tracking compliance deadlines in spreadsheets. KomplyOS automatically determines which laws apply to each building and sends proactive reminders.

Automatically calculates all applicable compliance deadlines for every building in your portfolio
Consolidated dashboard showing compliance status across all laws and all buildings
Proactive reminders sent at 18, 12, 6, 3, and 1 month before each deadline
Inspector scheduling and dispatch integrated with your compliance calendar
Filing status tracking from inspection through certification submission
Complete audit trail of inspections, filings, and compliance history

Frequently Asked Questions

Where can I find my building's specific compliance deadlines?

Your building's compliance deadlines depend on its community board district (for LL152), tax block number (for LL11 and LL87), and equipment inventory (for LL26 and FDNY requirements). KomplyOS automatically calculates all applicable deadlines based on your building's profile.

What happens if I miss a compliance deadline?

Missing a compliance deadline typically results in DOB or agency violations, civil fines (ranging from $1,000 to $10,000+ depending on the law), and potential operational restrictions. Some violations carry daily penalties for continued non-compliance. It is always better to file late than not at all.

How far in advance should I start preparing for a compliance deadline?

Start at least 6-12 months before major deadlines (LL11, LL87) and 3-6 months before recurring deadlines (LL26, LL152, FDNY). This accounts for inspector scheduling, weather delays, report preparation, and any required corrective work. KomplyOS sends automated reminders at appropriate intervals.

Do these deadlines apply to all NYC buildings?

Not all laws apply to every building. Applicability depends on building size (LL87: over 50,000 sq ft, LL97: over 25,000 sq ft), height (LL11: over 6 stories), and use (LL152: buildings with gas service). Review each law's specific requirements or use KomplyOS to automatically determine which laws apply to your buildings.

Can I track all these deadlines in one place?

Yes. KomplyOS consolidates all NYC building compliance deadlines into a single dashboard. It automatically determines which laws apply to each building in your portfolio, calculates deadlines, and sends proactive reminders so nothing falls through the cracks.