Sprinkler System Inspection Checklist (NFPA 25)
Quarterly and annual sprinkler system inspection checklist covering control valves, water supply, sprinkler heads, piping, and flow testing per NFPA 25.
NFPA 25Sprinkler System2-8 hours30 inspection items
Control Valves and Water Supply
- CheckboxVerify all control valves are open and locked or supervised
- CheckboxInspect OS&Y valve stem for proper thread engagement
- CheckboxCheck post indicator valves for correct open position
- CheckboxInspect fire department connection (FDC) caps and accessibility
- CheckboxVerify FDC check valve is not leaking
- CheckboxRecord static and residual water pressure at riser
Sprinkler Heads
- CheckboxVisual inspection of all accessible sprinkler heads
- CheckboxCheck for corrosion, paint, damage, or loading on deflectors
- CheckboxVerify correct temperature rating for location
- CheckboxConfirm 18-inch clearance below all sprinkler deflectors
- CheckboxCheck for missing or detached escutcheons
- CheckboxVerify spare sprinkler head cabinet has correct quantity and types
Piping and Hangers
- CheckboxInspect visible piping for corrosion, leaks, or mechanical damage
- CheckboxCheck pipe hangers and supports for secure attachment
- CheckboxVerify proper pipe pitch for drainage
- CheckboxInspect branch line restraints in seismic areas (if applicable)
- CheckboxCheck for unauthorized modifications or obstructions
- CheckboxInspect auxiliary drains and drum drips
Alarm and Flow Testing
- CheckboxConduct waterflow alarm test at inspector test connection
- CheckboxVerify alarm activates within 90 seconds of flow
- CheckboxConfirm alarm signal received at central monitoring station
- CheckboxTest vane-type and pressure switch waterflow devices
- CheckboxRecord flow test results (static, residual, and flow pressure)
- CheckboxTest fire pump (if applicable) per NFPA 25 Chapter 8
Dry and Pre-Action Systems (if applicable)
- CheckboxVerify air or nitrogen pressure is at correct level
- CheckboxTest low-air supervisory alarm
- CheckboxConduct full trip test of dry valve
- CheckboxRecord trip test time and water delivery time
- CheckboxInspect air compressor or nitrogen generator
- CheckboxCheck priming water level in dry valve
Use This Checklist Digitally in KomplyOS
Complete inspections on your phone, capture photos, collect signatures, and generate professional reports automatically.
Contact UsRelated Templates
NYC DOB / ASME
Boiler Inspection Checklist
Comprehensive annual boiler inspection checklist covering safety controls, combustion systems, pressure vessels, and operating conditions per NYC DOB requirements.
29 items45-90 min
NFPA 72 / FDNY
Fire Alarm System Inspection Checklist
Annual fire alarm inspection checklist covering initiating devices, notification appliances, control panels, and communication links per NFPA 72 and FDNY requirements.
32 items2-6 hours
NFPA 10
Fire Extinguisher Inspection Checklist
Monthly and annual fire extinguisher inspection checklist covering accessibility, condition, charge, and maintenance requirements per NFPA 10.
22 items15-30 min per unit