Sprinkler System Inspection Checklist (NFPA 25)

Quarterly and annual sprinkler system inspection checklist covering control valves, water supply, sprinkler heads, piping, and flow testing per NFPA 25.

NFPA 25Sprinkler System2-8 hours30 inspection items

Control Valves and Water Supply

  • Checkbox
    Verify all control valves are open and locked or supervised
  • Checkbox
    Inspect OS&Y valve stem for proper thread engagement
  • Checkbox
    Check post indicator valves for correct open position
  • Checkbox
    Inspect fire department connection (FDC) caps and accessibility
  • Checkbox
    Verify FDC check valve is not leaking
  • Checkbox
    Record static and residual water pressure at riser

Sprinkler Heads

  • Checkbox
    Visual inspection of all accessible sprinkler heads
  • Checkbox
    Check for corrosion, paint, damage, or loading on deflectors
  • Checkbox
    Verify correct temperature rating for location
  • Checkbox
    Confirm 18-inch clearance below all sprinkler deflectors
  • Checkbox
    Check for missing or detached escutcheons
  • Checkbox
    Verify spare sprinkler head cabinet has correct quantity and types

Piping and Hangers

  • Checkbox
    Inspect visible piping for corrosion, leaks, or mechanical damage
  • Checkbox
    Check pipe hangers and supports for secure attachment
  • Checkbox
    Verify proper pipe pitch for drainage
  • Checkbox
    Inspect branch line restraints in seismic areas (if applicable)
  • Checkbox
    Check for unauthorized modifications or obstructions
  • Checkbox
    Inspect auxiliary drains and drum drips

Alarm and Flow Testing

  • Checkbox
    Conduct waterflow alarm test at inspector test connection
  • Checkbox
    Verify alarm activates within 90 seconds of flow
  • Checkbox
    Confirm alarm signal received at central monitoring station
  • Checkbox
    Test vane-type and pressure switch waterflow devices
  • Checkbox
    Record flow test results (static, residual, and flow pressure)
  • Checkbox
    Test fire pump (if applicable) per NFPA 25 Chapter 8

Dry and Pre-Action Systems (if applicable)

  • Checkbox
    Verify air or nitrogen pressure is at correct level
  • Checkbox
    Test low-air supervisory alarm
  • Checkbox
    Conduct full trip test of dry valve
  • Checkbox
    Record trip test time and water delivery time
  • Checkbox
    Inspect air compressor or nitrogen generator
  • Checkbox
    Check priming water level in dry valve