NFPA 72 fire alarm ITM checklist. Visual inspections, functional tests, and sensitivity testing items for all fire alarm system components.
NFPA 72Fire Alarm System2-8 hours44 inspection items
Visual Inspection — Control Equipment
- CheckboxInspect fire alarm control panel (FACP) for trouble-free status
- CheckboxVerify panel power indicators (AC and battery) are lit
- CheckboxCheck panel for physical damage, corrosion, or unauthorized modifications
- CheckboxInspect remote annunciator panels for matching status to FACP
- CheckboxVerify all zone and device labels are legible and accurate
- CheckboxCheck that spare fuses of correct type are available at panel
Visual Inspection — Field Devices
- CheckboxInspect all manual pull stations for physical damage and accessibility
- CheckboxVerify pull stations are unobstructed and within 5 feet of exit doors
- CheckboxInspect smoke detectors for physical damage, paint, or dust accumulation
- CheckboxVerify 36-inch clearance around smoke detectors is maintained
- CheckboxInspect heat detectors for corrosion, damage, or paint
- CheckboxCheck duct smoke detectors for access panel functionality
- CheckboxInspect waterflow and tamper switch connections and wiring
Functional Testing — Initiating Devices
- CheckboxTest 100% of manual pull stations and verify alarm signal at FACP
- CheckboxTest smoke detectors using listed aerosol or calibrated test method
- CheckboxTest heat detectors using listed heat source (do not use open flame)
- CheckboxTest duct smoke detectors and verify HVAC fan shutdown
- CheckboxTest waterflow switches and verify alarm signal within 90 seconds
- CheckboxTest tamper switches and verify supervisory signal at FACP
- CheckboxVerify each device address matches panel programming and zone maps
Functional Testing — Notification Appliances
- CheckboxTest all audible appliances (horns, speakers, chimes) on each floor
- CheckboxMeasure sound levels to verify minimum 15 dBA above ambient or 75 dBA at pillow level (sleeping areas)
- CheckboxTest all visual appliances (strobes) for proper flash rate and candela
- CheckboxVerify voice evacuation messages are clear and intelligible
- CheckboxTest speaker circuits for proper supervision
- CheckboxDocument any areas where sound levels or strobe coverage is inadequate
Sensitivity Testing
- CheckboxPerform sensitivity testing of smoke detectors within first year, then every 2 years
- CheckboxUse calibrated test instrument to measure detector response threshold
- CheckboxCompare readings to manufacturer's listed sensitivity range
- CheckboxReplace or recalibrate any detector outside listed range
- CheckboxDocument sensitivity readings for each detector tested
- CheckboxMaintain sensitivity testing records for AHJ review
Communication and Monitoring
- CheckboxTest primary communication path to central station monitoring
- CheckboxTest secondary (backup) communication path to central station
- CheckboxVerify alarm, supervisory, and trouble signals received at central station
- CheckboxConfirm signal transmission time is within 90 seconds
- CheckboxTest FDNY connection functionality and verify signal receipt
- CheckboxDocument central station contact information and account numbers
Maintenance and Documentation
- CheckboxClean all smoke detectors per manufacturer specifications
- CheckboxTighten all terminal connections at FACP and field devices
- CheckboxReplace batteries per manufacturer recommended schedule
- CheckboxComplete NFPA 72 Record of Inspection and Testing form
- CheckboxDocument all deficiencies with photos and severity ratings
- CheckboxFile completed report with building owner and AHJ
Use This Checklist Digitally in KomplyOS
Complete inspections on your phone, capture photos, collect signatures, and generate professional reports automatically.
Contact UsRelated Templates
NYC DOB / ASME
Boiler Inspection Checklist
Comprehensive annual boiler inspection checklist covering safety controls, combustion systems, pressure vessels, and operating conditions per NYC DOB requirements.
29 items45-90 min
NFPA 72 / FDNY
Fire Alarm System Inspection Checklist
Annual fire alarm inspection checklist covering initiating devices, notification appliances, control panels, and communication links per NFPA 72 and FDNY requirements.
32 items2-6 hours
NFPA 25
Sprinkler System Inspection Checklist (NFPA 25)
Quarterly and annual sprinkler system inspection checklist covering control valves, water supply, sprinkler heads, piping, and flow testing per NFPA 25.
30 items2-8 hours