KomplyOS
Back to Templates

Kitchen Hood Suppression System Checklist — NFPA 96

Kitchen hood suppression inspection checklist per NFPA 96 and UL 300. Covers wet chemical systems, fusible links, nozzle alignment, and pull stations.

NFPA 96 / UL 300Kitchen Suppression30-60 min30 inspection items

General Information

  • Checkbox
    Record system manufacturer, model, and serial number
  • Checkbox
    Verify system type (wet chemical, dry chemical, water mist)
  • Checkbox
    Document number of nozzles and coverage zones
  • Checkbox
    Record last inspection date and service company
  • Checkbox
    Confirm UL 300 listing is current for system type

Suppression Agent and Cylinder

  • Checkbox
    Verify suppression agent cylinder is properly mounted and secured
  • Checkbox
    Check cylinder pressure gauge is in normal range
  • Checkbox
    Confirm safety pins and tamper indicators are intact
  • Checkbox
    Verify correct agent type and quantity per system design
  • Checkbox
    Check expiration date on agent cylinder

Nozzle Inspection

  • Checkbox
    Verify all nozzles are properly aimed at cooking surfaces
  • Checkbox
    Confirm nozzle caps or blow-off covers are in place
  • Checkbox
    Check nozzles for grease buildup or obstruction
  • Checkbox
    Verify nozzle spacing matches system design specifications
  • Checkbox
    Confirm no cooking equipment has been relocated from nozzle coverage area

Detection and Actuation

  • Checkbox
    Inspect fusible links for grease buildup or damage
  • Checkbox
    Verify fusible link temperature ratings are correct for location
  • Checkbox
    Replace fusible links at each semi-annual inspection
  • Checkbox
    Test manual pull station for proper operation
  • Checkbox
    Verify manual pull station is accessible and clearly marked
  • Checkbox
    Confirm gas valve automatic shutoff operates on system activation

Piping and Distribution

  • Checkbox
    Inspect all piping for damage, corrosion, or grease buildup
  • Checkbox
    Verify piping connections are tight and leak-free
  • Checkbox
    Confirm piping is properly supported and bracketed
  • Checkbox
    Check for any unauthorized modifications to piping layout

Hood and Duct Condition

  • Checkbox
    Verify hood is clean and properly maintained
  • Checkbox
    Check grease filters are in place and clean
  • Checkbox
    Confirm duct access panels are properly sealed
  • Checkbox
    Verify duct cleaning has been performed per NFPA 96 schedule
  • Checkbox
    Record date of last professional duct cleaning

Use This Checklist Digitally in KomplyOS

Complete inspections on your phone, capture photos, collect signatures, and generate professional reports automatically.

Contact Us